Integration of the VW LUPO in the Body Shop production lines of the VW Golf and SEAT Toledo for Alstom Contracting NV as subcontractor of FFT GmbH (2002). Location: VW plant in Brussels, Belgium.
Volkswagen
A5 project – New production lines for the Outer Body Sides and Inner Front Body Sides with Trumpf Haas lasers for the VW New Golf as subcontractor of ThyssenKrupp Drauz GmbH and ThyssenKrupp Nothelfer GmbH (2003-2004). Location: VW plant in Brussels, Belgium.
Integration of VW LUPO GTI/3L in the Body Shop production lines of the VW Golf and Lupo for Cegelec NV as subcontractor of FFT GmbH (2004).
Location: VW plant in Brussels, Belgium